Post Time:Jun 18,2012Classify:Industry NewsView:167
OAG will design and install two structurally glazed facades to the reception area of Tower One building. The work will also include the installation of two revolving doors and other entrances.
Scope of works
As of early April 2012 the Estates Division will commence works on site for the refurbishment of the existing reception areas to Towers 1 & 2. The works are being implemented to substantially enhance the quality of and accessibility to the reception areas of the Tower 1 & 2 buildings. The new reception will be an enlarged reception space which joins the two existing separate entrances in to one new joint reception area. The new joint reception will be achieved by removing the rather unsightly existing loading bay and existing reception £5m refurbishment to the teaching and office space within Tower 1.
The new enhanced reception area will incorporate.
Source: http://www.glassonweb.com/news/index/16201/Author: