Home > News > Glass Quotation > Uppermaking upbrick of tank welding

Uppermaking upbrick of tank welding

Post Time:Jun 12,2016Classify:Glass QuotationView:677

Upper clearance on chauffer 1 # ~ 5 # at the south and north side of the crown of the melting furnace of the floating glass production line which had been operating for 9 years, created partial deformation due to furnace design and temperature change, resulting in erosion at different degrees and serious burn-out and forming irregular triangular defects along the inclined arch about 80mm~100mm wide and 45 ° ~ 60 °, therefore the local temperature in the furnace was overly high, and the flame soared from the furnace and burnt the skewback beam, seriously threatening the safety of the furnace structure. By adopting the ceramic welding technology of our company, the leakage on the furnace was filled firmly and the service life of the furnace was effectively prolonged.

Source: Teng WangAuthor: Teng Wang

Hot News

返回顶部